Forged Undercarriage Part Track Shoes for Excavators

Product Details
Customization: Available
After-sales Service: Provide After-Sales Service
Warranty: Provide After-Sales Service
Manufacturer/Factory, Trading Company, Group Corporation
Diamond Member Since 2009

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
to see all verified strength labels (15)
  • Forged Undercarriage Part Track Shoes for Excavators
  • Forged Undercarriage Part Track Shoes for Excavators
  • Forged Undercarriage Part Track Shoes for Excavators
  • Forged Undercarriage Part Track Shoes for Excavators
  • Forged Undercarriage Part Track Shoes for Excavators
  • Forged Undercarriage Part Track Shoes for Excavators
Find Similar Products

Basic Info.

Model NO.
PC-200
Usage
GM Excavator
Bucket
Shovel
Transmission
Mechanical Transmission
Drive Type
Internal Combustion Drive
Bucket Capacity
>1.5m³
Size
Medium-Sized
Certification
ISO9001: 2000
Condition
New
Forging Chain
as Per Drawings
Color
as Per Drawings
Customizable
Customizable
Material
35mn/40mn
Transport Package
Wooden Package After Mandatory Treatment or Other
Specification
Forged track shoes
Trademark
NORD
Origin
Ningbo China
HS Code
84314999
Production Capacity
50000PCS

Product Description

Accurate in reading drawings & Fast in delivery & Exact dimension control & 100% quality control & OEM Service & Strict material inspection & Prompt quote & lead time guarantee

 
2.   Material: 35mn/40mn or as order.
3.Material Standard: ASTM,AISI,ASME,SAE,NF EN,DIN EN,ISO,,BS EN,SS,etc.
4.    Items: FOB Ningbo or Shanghai,China
5.    Lead time: 30~40 days
6.    Place of origin Ningbo, China
7.    Software for specification drawings: PDF, Auto CAD, Solidworks, JPG, ProE,etc.
8.    Main production equipments: 2 set of 1 ton forging hammer, 1 set of 3 ton forging hammer, 1set of 5 ton forging hammer, 1set of 3000ton and 1 set of 7800ton oil press hammers, CNC-machine-center, Lathe, Milling machine,Drilling machine,
Boring Lathe,Grinding Machine, Heat treatment Furnace.
9.Heat Treatment Machine: Mesh-Belt-Furnace,Carburizing Quench Furnace,Chamer Furnace,etc.
10.Surface Treatment: Cold/Hot Zn Plating,Blackening Treatment(Salt Spray Test 48-96 hours),Ni Plating,
Cr Plating,Spraying Undercoat,Anti-Rust Paint,Surface Paint,Plastic Paint,
Coated Anti-Rust Water,Anti-oil,etc.
11.Surface Heat Treatment: Medium Frequence Quenching,High Frequence Quenching and Carburizing and
Quenching,Oil Quenching,Water quenching,Normalizing,Temper,Annealing,etc.
12.Dimension Inspection: Calipers,Height Laugue,Micrometer Calipers,Inside Caliper Gauge,Angle
and R Gauge,Three coordinates measuring instrument.
13.    Productivity: 50000 pcs / year
14.    Packaging: Wooden package after mandatory treatment or other
15.    They are using for steamship mining equipment,Construction equipment,
Agricultural equipment,Train,Truck and others.
16. We make Open die forging and Closed die forging in Ningbo, China
If you have any other question, please feel free to contact us.

Forged Undercarriage Part Track Shoes for Excavators
Forged Undercarriage Part Track Shoes for Excavators
Forged Undercarriage Part Track Shoes for Excavators

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier