Stainless Steel Pipe Fitting for Pipe Tee

Product Details
Customization: Available
Customized: as Per Drawings
Lead Time: 35days
Manufacturer/Factory, Trading Company, Group Corporation
Diamond Member Since 2009

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
to see all verified strength labels (15)
  • Stainless Steel Pipe Fitting for Pipe Tee
  • Stainless Steel Pipe Fitting for Pipe Tee
  • Stainless Steel Pipe Fitting for Pipe Tee
  • Stainless Steel Pipe Fitting for Pipe Tee
  • Stainless Steel Pipe Fitting for Pipe Tee
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
pipe tee part 01
Process
Casting
Transport Package
Wooden Package After Mandatory Treatment, or Other
Specification
Lost wax casting
Trademark
NORD
Origin
Ningbo, China
Production Capacity
500000 PCS/Year

Product Description

Product Description

 

Product name: pipe tee
  
100% quality control
OEM service, ISO9001: 2000
Items: FOB NingBo or Shanghai, CIF XX
Lead time, 30 -40 days
Place of Origin: Ningbo, China
 
Accurate in reading drawings & Fast in delivery & Exact dimension control & 100% quality control & OEM Service & Strict material inspection & Prompt quote & lead time guarantee

 
2.   Material: Carbon Steel, Alloy Steel, Stainless Steel,Tooling Steel
3.Material Standard: ASTM,AISI,ASME,SAE,NF EN,DIN EN,ISO,,BS EN,SS,etc.
4.    Items: FOB Ningbo or Shanghai,China
5.    Lead time: 30~40 days
6.    Place of origin Ningbo, China
7.    Software for specification drawings: PDF, Auto CAD, Solidworks, JPG, ProE,etc.
8.    Main production equipments: 2 set of 1 ton forging hammer, 1 set of 3 ton forging hammer, 1set of 5 ton forging hammer, 1set of 3000ton and 1 set of 7800ton oil press hammers, CNC-machine-center, Lathe, Milling machine,Drilling machine,
Boring Lathe,Grinding Machine, Heat treatment Furnace.
9.Heat Treatment Machine: Mesh-Belt-Furnace,Carburizing Quench Furnace,Chamer Furnace,etc.
10.Surface Treatment: Cold/Hot Zn Plating,Blackening Treatment(Salt Spray Test 48-96 hours),Ni Plating,
Cr Plating,Spraying Undercoat,Anti-Rust Paint,Surface Paint,Plastic Paint,
Coated Anti-Rust Water,Anti-oil,etc.
11.Surface Heat Treatment: Medium Frequence Quenching,High Frequence Quenching and Carburizing and
Quenching,Oil Quenching,Water quenching,Normalizing,Temper,Annealing,etc.
12.Dimension Inspection: Calipers,Height Laugue,Micrometer Calipers,Inside Caliper Gauge,Angle
and R Gauge,Three coordinates measuring instrument.
13.    Productivity: 50000 pcs / year
14.    Packaging: Wooden package after mandatory treatment or other
15.    They are using for steamship mining equipment,Construction equipment,
Agricultural equipment,Train,Truck and others.
16. We make Open die forging and Closed die forging in Ningbo, China
If you have any other question, please feel free to contact us.
Detailed Photos

 


Stainless Steel Pipe Fitting for Pipe TeeStainless Steel Pipe Fitting for Pipe TeeStainless Steel Pipe Fitting for Pipe Tee
Stainless Steel Pipe Fitting for Pipe Tee
Stainless Steel Pipe Fitting for Pipe Tee

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier